RESTRICTED AREA CONTACT US ITALIANO ENGLISH
Complanari di Roma

A24 MOTORWAY - ROME SLIP ROADS

Client: Strada dei Parchi S.p.A.

Cost of works: €203,068,029

Construction of an urban motorway slip road, from Via Palmiro Togliatti to the Roma Est station; redevelopment of traffic and signposting devices of Casal Bertone at the Roma Est Station.

The project requires the widening of a section of the A24 Motorway for an overall extension of approximately 14 km.

The main components of the project include:

14 viaducts (approx. 2800 m), built with alternating steel and concrete decks and beams in pre-stressed concrete deck; a new junction with the Grande Raccordo Anulare; 9 overpasses and other minor road works such as underpasses, manhole covers and reinforced earth and concrete walls as well as service roads.

A temporary factory has been built near Lunghezza, in the Tivoli area, to produce beams in pre-stressed concrete and other prefabricated elements for the project.


   
 
> Road infrastructure
 
> Rome slip roads
> Valico Bypass
> A3 Salerno-Reggio Calabria
> Martignano tunnel
> Pescara-Francavilla bypass
> Lebanon
> Trunk Road No. 3 Flaminia
> E45 - Orte- Ravenna
> Torino-Savona Motorway - Stura viaduct
   
> Rail infrastructure
   
> Plants
   
> Industrial and civil construction

Copyright © 2012 TOTO S.p.A. COSTRUZIONI GENERALI
(P.I. 02208250692).

All rights reserved.